A dairy plant with 17 production lines had a manufacturing execution system (MES), but no clear view of OEE yet. We developed an OT strategy and guided the implementation, so that with minimal changes the plant gained insight into OEE in its existing MES.

Filling line in a dairy plant with white cartons on a curved conveyor
Sector
Food & FMCG
Services
Automation
Project Management
Segment
Large Enterprises

The challenge

The plant ran 17 production lines and already used an MES, but OEE was not yet part of it. As a result, there was no single, comparable picture of how well the lines were being used and where production time was being lost.

A stand-alone OEE solution or far-reaching changes to the controls were considered as scenarios, but were risky. The lines were in full production, and every intervention would mean downtime and carry risk.

The question was: how do we get reliable OEE on every line, with as few changes to the line as possible?

Our approach

  1. One definition for every lineTogether with production and the maintenance team, we agreed what counts as production time, downtime and loss. The same rules apply to all lines, so the figures were comparable with one another.
  2. An OT strategy with minimal interventionFor each line, we determined which signals were needed to establish running time, downtime and output reliably. Wherever possible, we used signals already present in the controls, keeping changes to the line to a minimum.
  3. OEE in the existing MESWe set up line utilisation within the MES the plant was already using. No separate system was added alongside it: the OEE data sits in the same place as the production orders.
  4. Rolling out line by lineWe introduced the standard in phases across all 17 lines. On each line, we checked with operators and the maintenance team that the figures matched what was happening on the shop floor.

What it delivered

  • One standard for 17 lines. The same definitions, signals and measurement method on every line.
  • No additional system. OEE is part of the MES the plant already used and managed.
  • Minimal changes to the line. An OT set-up that makes as much use as possible of what was already there.
  • Figures people recognise. Robust measurements that match what operators and the maintenance team see on the shop floor.

This gave the plant a reliable picture of how well its lines are being used. Production and the maintenance team can measure and compare losses in the same way, and tackle them in a targeted way.